Project Management 2

1.  Payback Analysis

Two new wind-farm tower projects are proposed for a small company that installs them in south western Pennsylvania. Project A will cost $250,000 to complete and is expected to have an annual net cash flow of $75,000. Project B will cost $150,000 to complete and should generate annual net cash flows of $52,000. As a small company, the owner and senior management team are very concerned about their cash flow.

Use the payback period method and determine which project is better from a cash flow standpoint.

Show your work and include any formulas used to calculate PP.

2.  Net Present Value

A recent project nominated for consideration at your company has a four-year cash flow of $20,000; $25,000; $30,000; and $50,000. The cost of the project is $75,000.

a.  If the required rate of return is 20%, conduct a discounted cash flow calculation to determine the NPV.

b.  What is the benefit-cost ratio for the project?

c.  What would the NPV of the above project be if the inflation rate was expected to be 4% in each of the next four years?

You will be assessed on the correctness of your calculations (40 points) and on presenting your work and results in a professional manner (10 points)

Do you need a similar assignment written for you from scratch? We have qualified writers to help you. You can rest assured of an A+ quality paper that is plagiarism free. Order now for a FREE first Assignment! Use Discount Code "FREE" for a 100% Discount!

NB: We do not resell papers. Upon ordering, we write an original paper exclusively for you.

Order New Solution